Project Summary:
In this parking lot in Everett, WA, our team grinded down the 2 high tree-root raised walkway panels to near even across the fractures, minimizing the trip hazards. The crew raised the low side to as even across before grinding, and evened out this sidewalk to eliminate a major trip hazard!